The short answer
The legal answer to how long does a water damage claim take is about 28 to 70 calendar days from a complete proof of loss to payment in the 7 states below with both clocks, unless the insurer sends written notice that it needs more time. Texas allows 15 business days to decide and 5 to pay; California allows 40 days, then 30.
What deadlines do 12 states set for a water damage claim?
The table reads each state’s statute or claims regulation and lists the 5 clocks that decide how long a homeowner waits. Each cell repeats the unit the text uses, because a Texas business day and an Ohio calendar day are not the same length. Where the section read sets no day count, the cell says so instead of guessing.
| State | Acknowledge | Investigation | Accept or deny | Pay after acceptance | Extension allowed | Citation |
|---|---|---|---|---|---|---|
| Texas | 15 days after notice | Within the same 15 days, plus a request for every item needed | 15 business days after all items arrive (30 days if arson is suspected) | 5 business days after notice of acceptance | Notice within the 15 business days, then decide by day 45; plus 15 days after a weather catastrophe | Tex. Ins. Code 542.055, 542.056, 542.057, 542.059(b) |
| California | 15 calendar days after notice | Begin within the same 15 days | 40 calendar days after proof of claim | 30 calendar days after acceptance | Written notice within the 40 days, then every 30 days | 10 CCR 2695.5(e), 10 CCR 2695.7(b), (c)(1), (h) |
| Florida | 7 calendar days after any claim communication | Begin 7 days after proof-of-loss statements; inspect within 30 days | Pay or deny 60 days after notice of the claim | Inside the same 60 days | State insurance office order after a declared emergency, capped at 30 more days | Fla. Stat. 627.70131 (1)(a), (3), (5)(a), (7)(a) |
| New York | 15 business days after notice | No day count in the section read | 15 business days after proof of loss and all requested items (30 if arson is suspected) | 5 business days after a settlement agreement | Notice within the 15 business days, then a letter every 90 days | 11 NYCRR 216.4(a), 11 NYCRR 216.6(c), (f) |
| Illinois | 15 working days (the rule’s definition of reasonable promptness) | No day count in the section read | Reasonable time; written explanation if unresolved 75 days after report or 25 days after proof of loss, whichever is less | 30 days after affirming liability on an undisputed amount | Explanation must carry a Notice of Availability of the Department of Insurance | 50 Ill. Adm. Code 919.40, 919.50, 919.80(d)(7) |
| Louisiana | No day count in the section read | Start loss adjustment 14 days after notice (30 after a catastrophe) | Written offer to settle after satisfactory proofs of loss; B(1) penalty if not made within 30 days | 30 days after satisfactory proofs of loss | Commissioner may add up to 30 days to the catastrophe adjustment clock | La. R.S. 22:1892 A(1), A(3), A(4), B(1) |
| Pennsylvania | 10 working days after notice | Complete within 30 days after notice | 15 working days after proofs of loss | No day count in the section read | Notice within the 15 working days, then at day 30 and every 45 days | 31 Pa. Code 146.5(a), 146.6, 146.7(a)(1), (c)(1) |
| New Jersey | 10 working days after notice | Commence within 10 working days | Pay first party claims 30 calendar days after proofs of loss | 10 working days after a settlement agreement | Written notice within 45 days of notice, then every 45 days | N.J.A.C. 11:2-17.6(b), 11:2-17.7(a), (c)(1), (e), (f) |
| Arizona | 10 working days after notice | Complete within 30 days after notice | 15 working days after proofs of loss | No day count in the section read | Notice within the 15 working days, then at day 45 and every 45 days | A.A.C. R20-6-801 (E)(1), (F), (G)(1) |
| Ohio | 15 days after notice | No day count in the section read | 21 days after proof of loss | 10 days after acceptance | Notice within the 21 days, then at least every 45 days | Ohio Adm. Code 3901-1-54 (F)(2), (G)(1), (G)(6) |
| Washington | 10 business days after notice | Complete within 30 calendar days after notice | 30 calendar days after notice of the claim | No day count in the section read | Notice within the 30 days, then every 30 days | WAC 284-30-360(1), 284-30-370(1), 284-30-380(1), (3) |
| Virginia | 15 calendar days after notice | Status letter at day 45 if not complete | 15 calendar days after proof of loss | No day count in the section read | Notice within the 15 days; letters every 45 days while open | 14VAC5-400-50(A), 14VAC5-400-60(A), (B) |
| NAIC Model 902 (template) | 15 days | Reasonable standards (Model 900) | 21 days after proofs of loss | 30 days after affirming liability | Notice within 21 days, then every 45 days | NAIC Model 902 sections 6 and 7 |
How we counted. We read each section on the official legislature or agency site, or on the Cornell Legal Information Institute copy of the state code, and copied the day count and its unit. We did not fill a blank cell from a law firm or claims vendor summary. Georgia, North Carolina and Colorado were dropped because their rule text could not be opened for this page. Several states also have catastrophe rules in separate sections (Louisiana R.S. 22:1892.2, for one) that this table does not cover.
Two patterns stand out. Eight of the 12 states, plus the NAIC model, require a written explanation on a fixed cadence when the insurer cannot decide in time, so a long claim should produce a letter every 30, 45 or 90 days. And only 7 states set both a decision clock and a payment clock in the sections read: Texas, California, Florida, New York, Ohio, Louisiana and New Jersey.
When does the clock start: your first call or your proof of loss?
Most decision clocks run from proof of loss, not from the day you report the leak. Texas counts from the date the insurer receives “all items, statements, and forms required by the insurer to secure final proof of loss” under 542.056, and Tex. Ins. Code 542.055(b) lets the insurer make additional requests during the investigation. Each new request can move that start line.
Florida and Washington are the exceptions. Fla. Stat. 627.70131 (7)(a) gives a residential insurer 60 days from notice of an initial, reopened or supplemental claim to pay or deny it, and 284-30-380(1) gives 30 calendar days from notification of the claim. In those two states the first phone call starts the main clock.
The template behind most of these rules is the NAIC Unfair Claims Settlement Practices Act (Model 900), which lists “failing to affirm or deny coverage of claims within a reasonable time” as an unfair claims practice without setting a number. The companion NAIC Model 902 (NAIC, 1997) supplies the numbers: 15 days to acknowledge, 21 days after proofs of loss to decide, and payment 30 days after liability is affirmed. Ohio’s 21 day decision clock matches the model.
What counts as proof of loss is set by the policy and the insurer’s request letter, and the form itself is covered on our proof of loss page. Sending it with a dated cover note gives you the start date every clock in the table runs from.

Texas or California: how far apart are the two clocks on a calendar?
The two largest states sit at opposite ends of the table. Under Tex. Ins. Code ch. 542, an insurer that uses every day it is allowed decides within 15 business days and pays within 5 more, about 28 calendar days in total. California’s 10 CCR 2695.7 allows 40 calendar days to decide and 30 to pay, 70 days, roughly 2.5 times as long.
The extension paths differ more than the base clocks. Texas caps an extended decision at the 45th day after the insurer’s notice under 542.056(d), and 542.059(b) adds 15 days to every deadline after a weather catastrophe declared by the commissioner, so the latest lawful Texas decision on a hurricane claim lands near day 81 after proof of loss. California has no end date: 10 CCR 2695.7(c)(1) only requires a written notice every 30 calendar days until a decision is made or a lawsuit is served.
Texas also prices the delay. 542.060(a) makes a noncompliant insurer pay interest on the claim at 18 percent a year plus reasonable attorney’s fees, and for suits covered by Chapter 542A the rate is the Finance Code rate plus 5 percentage points. California’s regulation carries no interest figure in the sections read here.
How many days can an insurer take from proof of loss to payment?
Adding each state’s decision clock to its payment clock gives the longest lawful wait for a homeowner whose paperwork is complete and whose insurer sends no extension notice. It is a ceiling, not a forecast: a 2 room leak with a clean estimate can close well inside it.
Pennsylvania, Arizona, Washington and Virginia drop out of the chart because the sections read set a decision clock but no payment clock, and Illinois drops out because 919.50 sets a 30 day payment clock but only a reasonable time to decide. In those states the NAIC Model 902 benchmark of 30 days after affirming liability is a fair question to put to the adjuster.
What stretches a water damage claim past 60 days?
Missing items reset the start line. In Texas the decision clock waits for every item the insurer requested within 15 days of notice, and New York’s 11 NYCRR 216.6(c) waits for “all items, statements and forms” the insurer requested. On a water loss a drying log, moisture readings and the mitigation invoice can all be on that list; the adjuster’s side of that visit is covered on our water damage adjuster page.
An inspection can take a month. Fla. Stat. 627.70131 (3)(b) gives a Florida insurer 30 days after proof-of-loss statements to physically inspect, and lets it use photos, video calls or drone footage instead under (3)(d). Florida also requires the insurer to send any detailed estimate within 7 days after its adjuster generates it, under (3)(e).
The check can stall after the insurer pays. Where a mortgage lender is named as a payee on the dwelling check, the lender’s endorsement and inspection process sits outside every one of the 12 state clocks in the table; how that works is set out on our insurance check and mortgage company page.
Where a replacement cost policy pays actual cash value first and releases withheld depreciation after repairs, a claim can meet every payment clock in the table and still stay open for months. The rules for that second payment are on our recoverable depreciation page.
Declared disasters extend the clocks by rule. Texas adds 15 days under 542.059(b); La. R.S. 22:1892 A(3) moves the adjustment start from 14 to 30 days after a catastrophe and lets the commissioner add up to 30 more; Florida’s office may extend the pay or deny period by no more than 30 days under Fla. Stat. 627.70131 (5)(a).

What can you do when the insurer misses a state deadline?
Start with a dated written request that names the rule. A California homeowner can cite 10 CCR 2695.7(b) and ask for the accept or deny letter or the written extension notice the rule requires; a Texas homeowner can cite Insurance Code 542.056(d) and ask for the reasons additional time is needed. Ask the adjuster for the date the insurer logged your proof of loss, because every clock above runs from a date in the insurer’s file.
The next step is a complaint to the state insurance department, which is free. New York’s 11 NYCRR 216.6(h) prints the route in the regulation itself: a complaint on the Department of Financial Services website or by mail to its Consumer Assistance Unit, One State Street, New York, NY 10004. The California Department of Insurance help page lists a consumer line at 1-800-927-4357 and an online complaint form. In Illinois, 919.50 and 919.80(d)(7) require the insurer’s written explanation to carry a Notice of Availability of the Department of Insurance.
A complaint file should hold the claim number, the date of first notice, the date proof of loss was delivered, every request the insurer made, and the rule and day count you believe was missed. Ask the department 2 things: whether the insurer’s extension letters met the cadence in the table, and whether the department will ask the insurer for a written response.
These rules describe what the regulation requires of an insurer; they do not say what a particular policy pays. For that, read the policy’s conditions section, call the state insurance department, and ask an attorney or public adjuster with a license in your state two questions: which deadline applies to this policy, and what remedy the statute gives if it was missed. Public adjuster fee rules by state are on our public adjuster fees page.
For contractors: when should a mitigation invoice expect payment?
A mitigation invoice is one of the items that completes proof of loss, so its delivery date can start the decision clock: 15 business days in Texas, 40 days in California, 21 days in Ohio. A contractor paid by the homeowner rather than the insurer waits on top of those clocks, and a lender endorsement can add more.
Before the job starts, a homeowner deciding whether a loss is worth a claim at all can weigh the deductible and the claim record first on our should I file a claim for water damage page. More claim process pages sit in the insurance hub.
Questions people actually ask
How long does a water damage claim take in Florida?
Under Fla. Stat. 627.70131, a residential insurer must acknowledge a claim communication within 7 calendar days, begin its investigation within 7 days of proof-of-loss statements, inspect within 30 days, and pay or deny within 60 days of notice of the claim. After a declared emergency the state insurance office may extend that by no more than 30 days.
Why would a water damage claim be denied?
The regulations require the reason in writing. California’s 10 CCR 2695.7(b)(1) requires a first party denial to list all bases for it, and NAIC Model 902 section 7A bars a denial on a policy provision unless the denial cites that provision. New York’s 216.6(c) adds that a rejection must point to any policy provision limiting the right to sue, and the scope of water coverage itself is set by your policy.
Can the insurer pay part of the claim while it disputes the rest?
In several states it must. New York’s 11 NYCRR 216.6(e) requires payment of undisputed elements despite disputes over others, Illinois 919.50 requires undisputed portions with a known payee to be paid within 30 days, and Florida’s 60 day rule applies to a claim “or a portion of the claim”.
How long does an insurer have to pay after I accept a settlement?
New York requires payment within 5 business days of the insurer receiving the agreement under 11 NYCRR 216.6(f). New Jersey allows 10 working days under N.J.A.C. 11:2-17.7(f). Texas allows 5 business days after the insurer’s notice of acceptance, and Ohio 10 calendar days after acceptance of an undisputed amount.
Does the insurer have to send me its estimate?
Florida is explicit: Fla. Stat. 627.70131(3)(e) requires the insurer to send the policyholder a copy of any detailed estimate within 7 days after its adjuster generates it, and (7)(a) requires a written explanation when the payment is less than that estimate. Other states in the table do not set an estimate deadline in the sections read, so ask for it in writing.
Sources
- Tex. Ins. Code ch. 542, Texas Legislature, sections 542.055 to 542.060 (Prompt Payment of Claims). Retrieved 16 November 2026.
- 10 CCR 2695.5 and 10 CCR 2695.7, California Code of Regulations, Fair Claims Settlement Practices Regulations, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- Fla. Stat. 627.70131, Florida Statutes 2025, Online Sunshine, The Florida Legislature. Retrieved 16 November 2026.
- 11 NYCRR 216.4 and 11 NYCRR 216.6, New York Codes, Rules and Regulations, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- 50 Ill. Adm. Code 919.40, 919.50 and 919.80(d)(7), Illinois Administrative Code Part 919, Improper Claims Practice, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- La. R.S. 22:1892, Payment and adjustment of claims, Louisiana State Legislature. Retrieved 16 November 2026.
- 31 Pa. Code 146.5, 146.6 and 146.7, Pennsylvania Code Title 31 Chapter 146, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- N.J.A.C. 11:2-17.6 and 11:2-17.7, New Jersey Administrative Code, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- A.A.C. R20-6-801, Arizona Administrative Code, Unfair Claims Settlement Practices, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- Ohio Adm. Code 3901-1-54, Unfair property/casualty claims settlement practices, via Cornell Legal Information Institute. Retrieved 16 November 2026.
- WAC 284-30-360, 284-30-370 and 284-30-380, Washington Administrative Code, Washington State Legislature. Retrieved 16 November 2026.
- 14VAC5-400-50 and 14VAC5-400-60, Virginia Administrative Code, Rules Governing Unfair Claim Settlement Practices, Virginia General Assembly. Retrieved 16 November 2026.
- NAIC Unfair Claims Settlement Practices Act (Model 900), January 1997 edition, and NAIC Model 902, Unfair Property/Casualty Claims Settlement Practices Model Regulation, July 1997 edition, National Association of Insurance Commissioners. Retrieved 16 November 2026.
- California Department of Insurance help page, consumer line and complaint form. Retrieved 16 November 2026.
- Chart totals and business day conversions are arithmetic on the clocks above, computed when this page was built. Our methodology sets out the standing rules.
This page describes regulation text, not any policy’s terms, and is not legal advice. Rules change; confirm the current section with your state insurance department before relying on a deadline.